York’s experimental communications satellite ready for launch
- by Defense News
- Jun 13, 2025
- 0 Comments
- 0 Likes Flag 0 Of 5
 Friday, Jun 13, 2025
York Space Systems is launching five missions this year, including a June 20 Space Development launch of the Dragoon spacecraft, pictured here. (York Space Systems)
The first of 12 satellites built by York Space Systems for a Space Development Agency demonstration mission is ready for launch, the company announced this week.
The spacecraft, dubbed Dragoon, will fly on SpaceXâs Transporter 14 rideshare mission, which is slated to launch June 20 on a Falcon 9 rocket from Vandenberg Space Force Base in California.
York is a key provider for SDAâs Proliferated Warfighter Space Architecture â a mega constellation of small missile warning and data transport satellites in low Earth orbit. The firm is building 136 satellites over three phases of the agencyâs Transport Layer. Ten of those satellites have already launched as part of the first phase, Tranche 0, and the remaining satellites will launch in batches over the next few years.
Of those satellites, 12 are part of a $200 million contract York received in 2022 as part of SDAâs Tranche 1 Demonstration and Experimentation System, known as T1DES. The satellites will carry various experimental communication payloads that typically fly in geostationary orbit, about 22,000 miles above Earth. Through T1DES, SDA wants to see whether payloads in low Earth orbit, around 1,200 miles, can provide the same capability.
T1DES was originally planned to launch next year, but last fall SDA requested that one of the satellites be accelerated to fly about six months earlier than planned. So, according to Yorkâs General Manager Melanie Preisser, the company pulled a spacecraft bus from its production line, integrated a prototype payload and tested the satellite in a matter of weeks.
Pressier told Defense News the faster schedule was a challenge but allowed the company to demonstrate its ability to respond quickly to customer needs. Along with assembling the spacecraft in a shorter window, York also acquired the commercial launch service through SpaceX â a step usually led by the government.
âThe government paid to accelerate the mission and then we made all the arrangements, contractual arrangements to make it happen,â she said. âIâm hoping that this is a model to accelerate moving out new capabilities for a variety of customers.â
The remaining 11 T1DES satellites are slated to launch in January 2026. Pressier said they are in production today and should be ready to integrate with their communication payloads this fall.
Meanwhile, Dragoon is one of five missions York is schedule to launch this year â the companyâs busiest annual cadence to date, Pressier said, and one thatâs not likely to slow down any time soon.
Along with Dragoon, the firm plans to launch a classified project called Tyndal. That mission will be followed by another communications demonstration dubbed Bard that is scheduled to launch in July. The company also has two SDA Transport Layer flights â the first in July and a second at the end of the year.
While Yorkâs involvement in SDA satellite development has largely been associated with the agencyâs communications layer, the company is eyeing opportunities to build spacecraft to support SDAâs missile tracking and custody layers, which will include satellites that can detect and engage targets.
York has worked internally to demonstrate that its spacecraft buses can integrate the more complex sensor payloads required for those satellites, Pressier said, adding that the Tyndal mission that York is building for a classified customer will demonstrate its utility for custody-type missions.
About
Please first to comment
Related Post
Stay Connected
Tweets by elonmuskTo get the latest tweets please make sure you are logged in on X on this browser.
Energy





